Key Points:
Uninstallation TAT will be 2 to 5 business days depending on the location
Standard Uninstallation of AC Covers only Split AC:-
Fixing hole sleeve & Cap
Fixing the Indoor and Outdoor Unit
Connecting Indoor and Outdoor units using the Standard Kit provided by the Manufacturer (at an additional cost, unless specified otherwise)
Wrapping the pipe with seasoning tape
Connection to Stabilizer or Power point in the range of Power Cord Provided by Manufacturer
Temperature/Performance Check & Demo and Maintenance tips filling the details in the warranty card
The Following shall not be covered under the benefits provided under this Offer:
Outdoor Unit Stand
Extra copper wire if any
Drain Pipe extension if any
Plumbing and Masonry Work
Wiring extension from Meter to site, Powerpoint/MCB fitting and any other electrical work, Carpentry work
Dismantling/Shifting of Old AC's Masonry, Core Cutting Fabrication and Electrical
This offer is not valid in Kerala